US Sign Code  San Antonio, TX
San Antonio · UDC §35-310.15

San Antonio sign permit — why your San Antonio wall sign depends on your street class

San Antonio sizes your wall sign as a percentage of your building elevation — but the floor you're guaranteed depends on whether your entrance faces a collector, an arterial, or an expressway. That table-driven structure is why a single number off a frontage calculator won't cut it. Here's what actually controls your sign.

30-second risk check

No address, no measurements — just tap Yes or No. This flags where a San Antonio sign gets risky.

Do you know your road's classification (collector / arterial / expressway)? It sets your minimum guaranteed sign area.
Have you sized your sign from the facade-percentage rule for your district?
Will the sign blink, flash, or have moving/animated elements?
Is your business in the River Walk area or a historic district?
Will any sign exceed 32 sq ft (the permit threshold)?
San Antonio uses a facade-percentage table, with a street-class minimum.

Under the Unified Development Code (§35-310.15), the maximum wall-sign area is a percentage of each building elevation set out in Table 310.15-2. But on top of that percentage, every occupancy gets a guaranteed minimum that scales with the class of street its public entrance faces. So your real allowance is "the greater of the table percentage or your street-class minimum" — which you can't read off a simple per-foot formula.

Your street class sets your guaranteed minimum

Whatever the facade percentage works out to, the code guarantees each occupancy at least this much sign area based on the street its separate public entrance faces:

Collector street
Minimum 50 sq ft of sign message area.
Arterial (Type A or B)
Minimum 75 sq ft of sign message area.
Expressway
Minimum 100 sq ft of sign message area.

Source: San Antonio Unified Development Code §35-310.15, Table 310.15-2 (wall signs / attached signs). Confirmed June 2026.

Advertisement

The rules that apply citywide

Beyond the facade table, these are confirmed in the UDC and Sign Code (Chapter 28). Use them as a sanity check before you talk to a fabricator:

Source: San Antonio UDC §35-310.15; City Sign Code Chapter 28 (§28-30, §28-43). Confirmed June 2026.

⚠ Why you can't just read a number off a calculator

The exact facade percentage lives in Table 310.15-2, and your real allowance is the greater of that percentage or your street-class minimum (50 / 75 / 100 sq ft). Getting it wrong — or missing that your entrance faces an arterial vs a collector — means a rejected permit. Any sign over 32 sq ft needs a permit, and electrical/structural work pushes you toward a licensed contractor.

Get a free quote from a licensed San Antonio sign contractor

Skip the facade-percentage table and street-class lookups. A licensed local pro confirms your exact allowance, checks the Table 310.15-2 figure for your elevation, and handles the permit.

Advertisement

How to apply for a San Antonio sign permit

San Antonio gives you two numbers and takes the better one — but only after you know what street class your entrance faces.

1. Find the street class your entrance faces
It sets your guaranteed minimum: 50, 75, or 100 sq ft. Missing that your entrance faces an arterial rather than a collector is what makes an application fail.
2. Pull the facade percentage from Table 310.15-2
The percentage is specific to your building elevation. Your real allowance is the greater of that percentage or your street-class minimum.
3. Test all three permit triggers, not just size
A permit is required for every freestanding sign, for every electric sign, and for a building or fence sign over 32 sq ft. Size is only one of the three — a small freestanding or illuminated sign needs a permit no matter how modest it is. A Sign Plan Review runs together with the permit, so treat them as one filing, not two stages.
4. Do not put the sign up before the permit issues
This is the expensive mistake. Starting work without a permit means the fee is doubled, and the City issues a violation notice against your contractor. An installer who offers to "go ahead and hang it while the paperwork clears" is proposing to double your cost and put their own licence at issue.
5. File with Development Services
The form to ask for is the "On-Premise Sign Permit" application, filed with the City's Development Services Department (DSD). Electrical and structural work pushes you toward a licensed contractor.
6. Know what your contractor owes you after issuance
The licensed contractor — not you — is responsible for scheduling inspections and closing the permit out. That makes two things worth checking as the owner: that inspections are actually being booked, and that any change of contractor is processed in writing, because an open permit left behind by a departed installer becomes your problem.

The three permit triggers, the Sign Plan Review pairing, the doubled fee and contractor violation notice, the application name, and the contractor's inspection and closeout duties are from City of San Antonio Development Services official permitting documents; the street-class minimums and Table 310.15-2 steps are from the confirmed items on this page. We do not publish a fee amount or a review time here. San Antonio provides a "Fee Schedule & Estimator" on the DSD pages at sa.gov that will calculate the figure for your specific sign — use that rather than any quoted number, and remember it doubles if you build first.

San Antonio sign checklist

Before you design or order anything, confirm:

Official San Antonio resources

Go straight to the city for permits and the binding code:

San Antonio Sign & Billboard Permits (Development Services) — applications, fees, and UDC §35-310.15.

Machine-readable source not obtained for the UDC figures on this page. The link above is permit-application guidance, not binding text. Searched again on 21 August 2026: the Municode copy of the Unified Development Code returns only site navigation, with or without a headless browser; the American Legal library, the sanantonio.municipal.codes mirror and the sa.gov UDC document paths all return nothing. A Wayback index of archived sa.gov documents surfaced no UDC article file. We attach no substitute URL, because none carries the figures.

I'm a new business owner and English isn't my first language — where do I start?
First find what street class your entrance faces — that sets your guaranteed minimum (50 / 75 / 100 sq ft). Then your fabricator pulls the exact facade percentage from Table 310.15-2. Because any sign over 32 sq ft needs a permit and the table is technical, most owners hire a licensed sign company that confirms the allowance and pulls the permit as part of the job.
Why can't this page just tell me my exact square footage?
San Antonio's allowance is the greater of a facade percentage (from Table 310.15-2) or a street-class minimum, plus Riverwalk and digital-display rules — variables that need site-specific confirmation. Anyone who gives you a single number sight-unseen is guessing. We give you the structure and the official sources so you don't get blindsided.
This is an informational guide based on the public San Antonio Unified Development Code (§35-310.15) and Sign Code (Chapter 28), not a permit, legal advice, or a guarantee of compliance. Wall-sign allowances in San Antonio depend on building elevation, the Table 310.15-2 percentage, street class, and special-area rules that require professional confirmation. Always verify with San Antonio Development Services and a licensed sign contractor before designing, ordering, or installing a sign.

Other US city sign guides

New YorkChicagoLos AngelesDallasAtlantaPhiladelphiaSan FranciscoMiamiFort WorthPhoenixAustinHoustonSan Diego

Sources and official references: San Antonio Development Services — Sign & Billboard Permits. Binding ordinance text not obtained. San Antonio publishes its sign rules in City Code Chapter 28 and Unified Development Code Article VI. No machine-readable copy was obtained on 21 August 2026 — the Municode library returns only site navigation on both the chapter and the article paths, the American Legal library returns nothing, and no city PDF of either was found in a Wayback index. We attach no substitute link, because none carries the figures, and the numbers on this page therefore stay outside the weekly automated check.

Last inspected against the official code: June 2026 · confirm current rules with the city before you file